| SPECIFICATIONS |
| Structure |
R.C.C. Frame Structure |
| Wall Structure |
Outer Wall :6”T.M. Red Bricks, Inner Wall:4”T.M. Road Bricks. |
| Floorings |
Vitrified Tiles throughout the Apartment |
| Windows |
Fully Glazed Aluminium Sliding Windows with M.S. Grills of Elegant Design. |
| Plaster |
Phanti Finish to walls and ceiling. Outer sand face 15mm to 20mm thick |
| Paint |
Interior OBD on putti finish surfaces. |
| Toilet |
Flooring:- colour ceremic Tiles. Dado : designer Ceremic tiles upto Loft Height. |
| Sanitary ware |
Indian WC (23”) European WC and Wash Basin. |
| Plumbing |
All plumbing in ‘B’ class G.I. Pipes and standard chromium plated outlets and hot and cold water mixer. |
| Water supply |
Corporation water supply through water sump and overhead water tank and one borewell. |
| Sanitary |
All Sanitary vertical lines in PVC pipes of standard quality. Horizontal sanitary lines below ground level in S.W. pipes. |
| Elevator |
4/6 passenger Elevator. |
| Generator Backup |
Generator backup shall be provided for 15KV to 20 KV for lift & Pumps common Lighting |
| Note:- all expenses towards electric meter, M.S.E.B. Room , Transformer, cable Charges, ORC & SLC Charges , water meter, sale Deed Expenses, Services tax , or any other taxes levied by state or central Government or any authority and escalation charges shall be borne by apartment owner. |